I don't remember the timeline too much.. I just know it went into "assembly" a week ahead of quality control. I want to say assembly around 7/26 and quality check the day it was suppose to be done.. 8/3. Delivery was ORIGINALLY slated for 8/8, but like I mentioned before the engineering holds pushed that back. Not a single M40i moved from the VPC to anywhere until 8/10.
__________________
Fully Loaded
|