Quote:
Originally Posted by marmite
I have a long tense wait now. I ordered the 3 litre diesel version back on 30/01/2011, but was put in factory queue status (code 077).
Not that long after (11/02/2011), it moved into the production queue (status code 1100) - production week 17, which equals w.c. 25th April 2011.
The ETD is week 23 (w.c. 6th June 2011).
A couple days ago, I decided to change the order to M Sport and a couple of other specs. - luckily that didn't change the etd. (specs. in signature)
I can't wait!!
|
Nice one marmite. Spec looks very good (and expensive!!!). The ETD looks consistent with my order wrt when it's due to go into production. I'm sure it will be worth the wait.
Congrats!